
From Paper-Based Tracking to Full Project Traceability: How Jadeela Steel Gained Real-Time Control with Fabritec
Jadeela Steel was running complex PEB fabrication projects on Excel, paper records, and phone calls. As project volume grew, visibility collapsed and client confidence was at risk. After implementing Fabritec in January 2025, the team gained real-time control across projects, production stages, drawings, quality, and reporting — and eliminated manual tracking entirely.
35%Reduction in manual production monitoring time60%Improvement in production visibility and reporting accuracy
JADEELA STEEL INDUSTRIESRead case study
