
From Paper-Based Tracking to Full Project Traceability: How Jadeela Steel Gained Real-Time Control with Fabritec
Jadeela Steel was managing complex pre-engineered building (PEB) fabrication projects using Excel, paper records, and phone calls. As the number of projects increased, the ability to follow execution clearly declined, putting client confidence at risk. After implementing Fabritec in January 2025, the team gained real-time control over projects, production stages, drawings, quality, and reporting, while eliminating manual tracking entirely.
35%Reduction in time spent on manual production follow-up60%Improvement in production-status visibility and reporting accuracy
JADEELA STEEL INDUSTRIESRead case study

