METAL & STEEL FABRICATION
From the first drawing to the last erected item—under control.
Run structural steel, PEB, and heavy fabrication projects from one connected execution system. Fabritec brings your enquiries, projects, BOMs, drawings, revisions, workforce, production stages, quality records, shipping, delivery, and site erection progress together—so every team works from the same live information. Stop chasing updates. See what is ready, what is delayed, what is blocked, and what requires attention next.

Why steel fabrication projects lose control
Steel projects rarely lose control because of one major event. Control is usually lost through smaller disconnects: a revised drawing that never reaches the workstation, a skilled operator assigned by memory, an unexpected equipment stoppage, a completed mark waiting for inspection, or a truck loaded in the wrong erection sequence. By the time management sees the complete problem, it may have already affected production, quality, dispatch, delivery, or site erection.
- Multiple projects and urgent priorities managed in the same Excel sheets
- Skilled welders and operators assigned without clear shift or workstation capacity
- Quality issues and rework discovered after fabrication is already complete
- Drawing and BOM revisions reaching production late—or not at all
- Cutting, welding, or galvanizing downtime affecting delivery without early warning
- Shipping, delivery, and erection progress tracked through calls, WhatsApp, and spreadsheets
Zoom sur Metal & Steel Fabrication
Comment Fabritec s’adapte aux réalités quotidiennes de Metal & Steel Fabrication, de l’atelier à l’expédition.
Every project. Every phase. Every mark.
Steel work does not run through generic part lists. It runs through projects, phases, assemblies, marks, and production stages. Fabritec keeps progress visible at every level, so planners and production teams know exactly what is ready, what is in progress, and what must happen next.
The right drawing at the right workstation.
Connect each mark to its BOM, drawings, documents, and current revision. When engineering releases a change, teams can identify the affected work, control outdated information, and keep production aligned with the approved version.
Skilled people and available machines—planned together.
Schedule welding crews, operators, and shifts against real workstation requirements. Connect production planning with labour availability, operator qualifications, preventive maintenance, equipment status, and production-impacting breakdowns.
Quality, dispatch, and erection that remain traceable.
Capture inspections, approvals, nonconformities, and rework at the production stage where they occur. Then track every item through shipping yard, transit, site delivery, and erection—with delivered, erected, and remaining quantities kept in the same project record. Fabritec’s source materials define the erection lifecycle as Production, Shipping Yard, In Transit, Delivered but not erected, and Erected.
One system. Every stage. No more chasing updates.
When sales, engineering, planning, workforce, production, maintenance, quality, logistics, and site teams work from one system, time moves away from follow-up and back into execution. Fabritec gives everyone—from the shop floor to senior management—the same live picture of what is happening, what is at risk, and what needs attention next.
- Convert won enquiries and tenders into active projects without rebuilding the project manually
- Plan BOM-driven work by project, phase, mark, stage, workstation, and required delivery date
- Assign qualified crews and operators to the right workstation, rotation, and shift
- Connect each revision to the correct drawing, affected mark, production stage, and team
- See what is production-ready, awaiting QC, blocked, ready to dispatch, delivered, or erected
- Monitor workload, workstation uptime, labour output, stage throughput, and project risks through live dashboards
Ce qui change avec Fabritec
You stop guessing. You start knowing.
See every active project, mark, production stage, crew, and workstation in real time. Management no longer has to wait for morning meetings, supervisor calls, or manually prepared reports to understand what happened on the shop floor.
Every decision uses the right version—always.
Keep every mark connected to its approved drawing, revision, BOM, and production history. When a client, consultant, or quality team asks what was used, who worked on it, or when it passed inspection, the supporting record is already available.
Commit to delivery dates with real capacity behind them.
Understand what is ready to produce, whether the required labour and machines are available, what is clearing quality, and what can be dispatched. Plan loading around the sequence the project site needs—not simply the sequence the factory finishes.
Prove progress and productivity with data.
Track output by workstation, labour, or production stage using the unit that fits the operation—such as weight, length, area, or pieces. Give leadership clearer evidence of bottlenecks, utilization, delays, rework, and project risk instead of relying on impressions
La preuve dans Metal & Steel Fabrication

JADEELA STEEL INDUSTRIES
From Paper-Based Tracking to Full Project Traceability: How Jadeela Steel Gained Real-Time Control with Fabritec
Fabritec enabled full real-time visibility across our projects, both internally and client-facing. This level of transparency strengthened client confidence and supported our commercial engagements.
Lire l’étude complèteReduction in manual production monitoring time